Critical stage inspections 1

Under  the   NSW ENVIRONMENTAL PLANNING AND ASSESSMENT REGULATION 2000, in the case of a class 1 and/or 10 building, the inspections  that are  to  be carried  out  by  the  Principal Certifier [PC] are currently [with applicability as determined by the PC] :

  • after the barrier has been erected before filling pool with water, and

  • after excavation for, and prior to the placement of, any footings, and

  • prior to pouring any in-situ reinforced concrete building element, and

  • prior to covering of the framework for any floor, wall, roof or other building element, and

  • prior to covering waterproofing in any wet areas, and

  • prior to covering any stormwater drainage connections, and

  • After the building work has been completed and prior to any occupation certificate being issued in relation to the building (EPA REGS 2000).